-
Bug
-
Resolution: Duplicate
-
None
-
1.21.51 Hotfix
-
None
-
Unconfirmed
-
Windows
Steps to reproduce:
Shown in the video. Place two layers of slabs with a gap of half block. Right click on the top layer with the same type of slab.
Observed:
Slabs are placed underneath, between two layers.
Expected:
Slabs should be placed above the top layer.
- duplicates
-
MCPE-168979 Places bottom slab above top slab if another top slab is above it.
- Reopened